Bayer India, Vapi Agrochemical facility

Bayer India, Vapi Agrochemical facility

Project Information
Investment: 110 Mio.
  • 16 Pilot and production scale Multi purpose units (MPU)
  • Flexible Train concept
  • 16 Reaction / Crystallization Trains
  • 5 Distillation Trains
  • 5 Drying Trains
Rector Size 0,25 up to 12 m³
Intermediates / Feed supply from Containers or Tank Farm Filling / packing for Liquids (Drums, Container) and solids (Sacks, Drums, Big Bags) Central transfer stations (piped connections)
Utilities:
Heating cooling System (-20°C / +180°C)
  • Steam
  •  Demineralised water
  • Cooling water
  •  Nitrogen
  •  Instrument Air
  •  Ammonia
Responsibilities
  • Basic Engineering Review
  • Detailed Engineering
  • Procurement Assistance
  • Execution Support

Address

Office

Unit No 401, 4th floor, A wing, Manikchand Ikon, Plot no-246, C.T.S No.18 & 18/1 Bund Garden,
Pune - 411001 , Maharashtra.

Contact us

Contact

+91 ( 20 ) 67080300
+91 97304 44213

Email id

info@triveritas.in
hr@triveritas.in

Locate us on map

COPYRIGHT © 2025 ALL RIGHTS RESERVED | Developed By – OMX Technologies

Scroll to Top